Linha do Alentejo

Linha do Alentejo

The line is made up of the following sections (inauguration date):

Barreiro-Bombel section (1857)
Bombel-Vendas Novas section (1861)
Vendas Novas-Évora section (1863)
Évora-Beja section (1964)
Beja-Casével section (1870)
Casével-Amoreiras section (1888)
Amoreiras-Faro section (1889)

The different sections location map:

The most important bridges and tunnels location map. Click to learn more about each construction: