Ponte Rodoviária Vasco da Gama, Lisboa, Construção

Dublin Core

Title

Ponte Rodoviária Vasco da Gama, Lisboa, Construção

Source

SOUZA, A., COELHO, A. (2003). Desafios de engenharia em Portugal. Odebretch S.A., Salvador.

Rights

PT BUILDS

Coverage

1995-1998, Lisboa/Alcochete, Portugal

Construction Work Item Type Metadata

Individual actors

"Tejo Projeto" Design Consortium

COBA, Consultores para Obras, Barragens e Planeamento, S.A. (Leader of the Consortium)
Proponte, Projetos de Pontes e Estruturas Especiais, Lda.
EEG, Europe Etudes GECTI
Kvaerner Technology, Ltd.
"Tejo Ponte Control" Management Consortium

Tudor Engineering Company
A2P, Consultores para Obras e Projetos, Lda.
Hyder Consulting, Ltd.
Provia, Consultores de Engenharia, Lda.

Construction Companies

"Lusoponte" Contractors Consortium

Kvaerner Corporate Development (23,80%)
Kvaerner Constrution (1%)
Campenon Bernard, SGE SPE (22%)
Bento Pedroso Construções, S.A. (14,84%)
Mota & Companhia, S.A. (13,83%)
Somague, Sociedade de Construções, S.A. (13,83%)
Teixeira Duarte, Engenharia e Construção, S.A. (7,5%)
Sociedade de Construção H. Hagen, S.A. (2,80%)
Edifer, Construções Pires Coelho & Fernandes, S.A. (0,4%)

Materials and building systems

Typology

Bridge

Bridge spans

Total Lenght: 12345,0m
Spans: 488,0m (11 spans); 672,0m (12 spans); 826,0m (3 spans); 65310,0m (80 spans); 2825,0m (84 spans)

Bridge foundations

Main Bridge Foundations:
- 44RC piles with 2,2m diameter. Maximum depht: 65,0m

Central Viaduct Foundations:
- 81 double pillars each on 8 driven piles with 1,7m diameter.
- Maximum depht 95,0m

South Viaduct Foundations:
- 85 sets of 4 pillars each on RC pilles.

Bridge superstructure

Main Bridge:
- Cable-stayed bridge harp design with 420,0m maximum span.
- Spans: 1x203,0m; 1x420,0m; 1x203,0m.
- Central towers 150,0m high
- The deck made of mixed structure. Reinforced concrete slabs on secondary steal beams. The secondary beams lay on two lateral reinforced concrete beams.

Central Viaduct:
- Beam bridge maximum individual spam 78,0m.
- Pre-fabricated beam bridge.
- 81 double pillars

South Viaduct
- Double deck on pre-fabricated double beam bridge.
- Individual beam spam 45,0m

Collection

Citation

PT BUILDS, “Ponte Rodoviária Vasco da Gama, Lisboa, Construção,” Portugal Builds, accessed May 3, 2024, https://www.portugalbuilds.org/items/show/256.

Output Formats

Geolocation

Item Relations

This Item Relation Item: Mota & Companhia Profile
This Item Relation Item: Somague Profile
This Item Relation Item: Teixeira Duarte S.A. Profile
This Item Relation Item: Edifer, Pires Coelho & Fernandes, S.A.R.L Profile
This Item Relation Item: Reinforced Concrete
This Item Relation Item: Prestressed Concrete
This Item Relation Item: Armando Rito Profile
This Item Relation Item: Michel Virlogeux Profile
This Item Relation Item: Charles Lavigne Profile
This Item Relation Item: Alain Montois Profile
This Item Relation Item: COBA, Consultores para Obras, Barragens e Planeamento, S.A. Profile